Well, Meredith is visiting her folks this week, so I decided that now was the time. I had made the baby steps (which seemed like large ones) to cut the wood and stain the appropriate pieces before this week, and Meredith, in her desperation for a normal closet/bedroom (we had taken the old shelves down, so shoes were all over the place), had primed the painted pieces for me.
So I set out to work...I painted the pieces, and then I figured out how I would attach everything together. Here's the first stage of the assembly:
So if it isn't obvious, this thing is big. This is only half of the shelving. Next, I put together the other half, and then attached the bottom and top. Here it is in stage two of assembly:
As you can see, we're starting to get there. Lastly, I moved the rack into the closet, screwed on the legs, and loaded it up. Here's the finished product, shoes and all:
Well, there you have it. Three months (or probably more...maybe five or so) of work culminated. I'd say it was fun, but it was a lot of work. The fun part was solving the problem, which explains a lot about why I'm an engineer I guess.
2 comments:
WOW!!!!
What awesome shoes! I am getting jealous! No wonder the boxes didn't do it. Steve, you did a fantastic job--what a good husband. :)
You are so good with wood! I am so proud of you. I wish I had a shelf for mine like that. I wouldn't mind that collection of shoes either. :)
Post a Comment